Drawing-to-delivery route

Five key stages with clear project handoffs

A structured path from drawing review and tooling through sample approval, controlled production, inspection and delivery.

Billets and prepared stock at a Jungong cutting station

Five-stage project route

Each stage clarifies the required information and the next Jungong action.

  1. Drawing review

    Customer input

    Provide the current drawing, material or performance requirement, part weight, annual quantity and requested supply condition.

    Jungong action

    Reviews the drawing, geometry and requested production basis together.

  2. Tooling

    Customer input

    Confirm the drawing revision and the project basis that the tooling route must follow.

    Jungong action

    Prepares the tooling route around the confirmed geometry and production basis.

  3. Sample approval

    Customer input

    State the approval criteria that must be agreed for the project.

    Jungong action

    Checks sample parts against the agreed approval criteria before repeat production.

  4. Controlled production

    Customer input

    Keep the approved drawing and order requirements current for repeat production.

    Jungong action

    Uses the approved requirements for repeat forging and any confirmed machining operations.

  5. Inspection & delivery

    Customer input

    State required checks, records, supply condition and destination before quotation.

    Jungong action

    Completes the agreed checks, release items, packing and delivery documents.

Manufacturing references

Billet preparation and workshop manufacturing

Billets prepared beside cutting equipment in the Jungong workshop

Billet preparation

Billet cutting and prepared stock in the Jungong workshop.

Jungong forging workshop production floor

Forging workshop

Jungong forging workshop in Linyi

Drawing review / RFQ

Once the project information is confirmed, we can review scheduling and lead time.

Provide the current drawing revision and demand basis to begin project review.

Start an RFQ →